Hazardous ideas for Himalayas
Red Book
Red Book

Pre-cum-Mains GS Foundation Program for UPSC 2026 | Starting from 5th Dec. 2024 Click Here for more information

Context: China’s major hydropower project as a part of its 14th Five-Year Plan (2021-25), on the Yarlung Zangbo River, in Mêdog County in Tibet.

More on news:
  • The hydropower generation station is expected to provide 300 billion kWh of electricity annually. The Chinese authorities say the project will help the country realise its goal of reaching a carbon emission peak before 2030 and carbon neutrality before 2060.
  • Indian counterparts were quick to restate their plans to dam the Himalayas on this side of the border. India is reportedly considering a 10-GW hydropower project in an eastern State.
What are the various misadventures that can happen due to the building of hydropower dams?
  • Unavailability of dams: Both countries ignore how unviable such ‘super’ dams projects are, given that they are being planned in an area that is geologically unstable.
  • Competing dams: Over the past 20 years, both China and India have been competing with each other to build hydroelectric dams in this ecologically fragile and seismically vulnerable area.
    • There are two hydropower projects in the works in Arunachal Pradesh on the tributaries of the Brahmaputra: the 600 MW Kameng project on the Bichom and Tenga Rivers and the 2,000 MW Subansiri Lower Hydroelectricity Project.
    • China has already completed 11 out of 55 projects that are planned for the Tibetan region.
  • Overestimating economic potential: In executing these hydroelectric projects, the two countries have overestimated their economic potential and grossly underestimated the earthquake vulnerability of the region.
  • Earthquakes in the region: High seismic zones coincide with areas of high population concentration in the Himalayan region where landslides and glacial lake outburst floods are common.
    • About 15% of the great earthquakes of the 20th century occurred in the Himalayan region. The northeast Himalayan bend has experienced several large earthquakes of magnitude 7 and above in the last 100 years, more than the share from other parts of the Himalayas.
    • The 2015 Gorkha earthquake of magnitude 7.8 in central Nepal resulted in huge losses in the hydropower sector. Nepal lost about 20% of its hydropower capacity consequent to the earthquake.
  • Landslides: The main mechanisms that contributed to the vulnerability of hydropower projects were found to be landslides, which depend on the intensity of seismic ground shaking and slope gradients.
    • Heavy siltation from giant landslides expected in the project sites will severely reduce the water-holding capacity and life expectancy of such dams.
    • Even without earthquakes, the steep slopes made of soft rocks are bound to slide due to deforestation and road-building.
What can be done?
  • Nature reserve: In recent years, the Himalayas have seen the highest rate of deforestation and land use changes. The upper Himalayas should be converted into a nature reserve by an international agreement.
  • Himalayan river commission: The possibility of a Himalayan River Commission involving all the headwater and downstream countries needs to be explored.
Way forward
  • India and China, the major players in the region, would be well advised to disengage from military adventurism and seek ways of transforming this ‘roof of the world’ into a natural reserve for the sake of humanity. Carbon neutrality should not be at the expense of the environment.

Discover more from Free UPSC IAS Preparation For Aspirants

Subscribe to get the latest posts sent to your email.

Print Friendly and PDF
Blog
Academy
Community