Q. Dam Rehabilitation and Improvement Project (DRIP) is being implemented with financial assistance from?
Answer: A
Notes:
Explanation: Dam Rehabilitation and Improvement Project (DRIP): DRIP is being implemented with financial assistance from the World Bank to improve the safety and operational performance of selected existing dams along with dam safety institutional strengthening with system-wide management approach.
- DRIP phase-I (2012-21): 223 dams were rehabilitated.
- DRIP Phase II (2021-31): Envisage improving the safety and operational performance for rehabilitation of 736 dams.
Source: Economic Survey