{"id":240011,"date":"2023-04-28T20:37:49","date_gmt":"2023-04-28T15:07:49","guid":{"rendered":"https:\/\/blog.forumias.com\/?p=240011"},"modified":"2023-05-02T16:33:21","modified_gmt":"2023-05-02T11:03:21","slug":"railway-network-in-14-states-100-electrified-in-fy23-northeast-lags","status":"publish","type":"post","link":"https:\/\/forumias.com\/blog\/railway-network-in-14-states-100-electrified-in-fy23-northeast-lags\/","title":{"rendered":"Railway network in 14 states 100% electrified in FY23, Northeast lags"},"content":{"rendered":"\n<p><b>Source: <\/b><span style=\"font-weight: 400;\">The post is based on the article<\/span><b> \u201c<\/b><b>Railway network in 14 states 100% electrified in FY23, Northeast lags<\/b><b>\u201d <\/b><span style=\"font-weight: 400;\">published in<\/span><b> Business Standard on 27th April 2023<\/b><\/p>\n<h2><b>What is the News?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Indian Railways has completed 90% electrification of its <\/span><span style=\"font-weight: 400;\">broad-gauge(BG)<\/span><span style=\"font-weight: 400;\"> network as of March 31, 2023.<\/span><\/p>\n<p><b>\u2013 Note: <\/b><span style=\"font-weight: 400;\">Gauge refers to the vertical length between railway tracks, with various measurements used across the globe for train operations.<\/span><\/p>\n<h2><b>About Electrification of <\/b><b>Broad Gauge (BG) Network of <\/b><b>Railways<\/b><\/h2>\n<figure id=\"attachment_240012\" aria-describedby=\"caption-attachment-240012\" style=\"width: 620px\" class=\"wp-caption alignleft\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-240012 size-full\" src=\"https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2023\/04\/1682616549-8429.jpg?resize=620%2C918&#038;ssl=1\" alt=\"Broad gauge(BG) network of Railways\" width=\"620\" height=\"918\" srcset=\"https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2023\/04\/1682616549-8429.jpg?w=620&amp;ssl=1 620w, https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2023\/04\/1682616549-8429.jpg?resize=203%2C300&amp;ssl=1 203w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><figcaption id=\"caption-attachment-240012\" class=\"wp-caption-text\">Source: Business Standard<\/figcaption><\/figure>\n<p><span style=\"font-weight: 400;\">Indian Railways has set a target to complete the Electrification of its Broad gauge network by December 2023.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Till now, it has <\/span><span style=\"font-weight: 400;\">fully electrified the BG network of 14 states and union territories (UTs).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The pace of electrification between 2014 and 2019 was 7.5 rkm per day which doubled to 15.3 rkm per day between 2020 and 2022.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In FY23, this pace rose further to 18 rkm per day, the highest the national transporter has managed in a single year.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, the progress in the Northeast, barring Meghalaya is in contrast to the success elsewhere as five states were yet to have a single track electrified.<\/span><\/p>\n<p><b>What are the benefits of the Electrification of the BG network of Railways?<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Electrification offers numerous benefits, including saving over Rs 150 crore on fuel bill every year, seamless operations, pollution-free mode of transport and increase average speed.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Source: The post is based on the article \u201cRailway network in 14 states 100% electrified in FY23, Northeast lags\u201d published in Business Standard on 27th April 2023 What is the News? Indian Railways has completed 90% electrification of its broad-gauge(BG) network as of March 31, 2023. \u2013 Note: Gauge refers to the vertical length between&hellip; <a class=\"more-link\" href=\"https:\/\/forumias.com\/blog\/railway-network-in-14-states-100-electrified-in-fy23-northeast-lags\/\">Continue reading <span class=\"screen-reader-text\">Railway network in 14 states 100% electrified in FY23, Northeast lags<\/span><\/a><\/p>\n","protected":false},"author":10317,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"footnotes":""},"categories":[1566,3127,9],"tags":[10503,11540],"class_list":["post-240011","post","type-post","status-publish","format-standard","hentry","category-daily-factly-articles","category-economy","category-public","tag-business-standard","tag-electrification-of-railways","entry"],"jetpack_featured_media_url":"","views":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/240011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/users\/10317"}],"replies":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/comments?post=240011"}],"version-history":[{"count":0,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/240011\/revisions"}],"wp:attachment":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/media?parent=240011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/categories?post=240011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/tags?post=240011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}