{"id":336310,"date":"2025-05-12T16:50:25","date_gmt":"2025-05-12T11:20:25","guid":{"rendered":"https:\/\/forumias.com\/blog\/?p=336310"},"modified":"2025-05-15T20:48:18","modified_gmt":"2025-05-15T15:18:18","slug":"tapti-basin-mega-recharge-project-tbmrp","status":"publish","type":"post","link":"https:\/\/forumias.com\/blog\/tapti-basin-mega-recharge-project-tbmrp\/","title":{"rendered":"Tapti Basin Mega Recharge Project (TBMRP)"},"content":{"rendered":"<p><strong>News: <\/strong>In a major step towards ensuring regional water security, the governments of Madhya Pradesh and Maharashtra signed a Memorandum of Understanding (MoU) on Saturday to collaboratively implement the Tapti Basin Mega Recharge Project. <strong>Tapti Basin Mega Recharge Project (TBMRP).<br \/>\n<\/strong><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\" wp-image-336874 aligncenter\" src=\"https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2025\/05\/Tapti-Basin-Mega-Recharge-Project-TBMRP.png?resize=614%2C407&#038;ssl=1\" alt=\"Tapti Basin Mega Recharge Project (TBMRP)\" width=\"614\" height=\"407\" srcset=\"https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2025\/05\/Tapti-Basin-Mega-Recharge-Project-TBMRP.png?resize=300%2C199&amp;ssl=1 300w, https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2025\/05\/Tapti-Basin-Mega-Recharge-Project-TBMRP.png?resize=1024%2C680&amp;ssl=1 1024w, https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2025\/05\/Tapti-Basin-Mega-Recharge-Project-TBMRP.png?resize=768%2C510&amp;ssl=1 768w, https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2025\/05\/Tapti-Basin-Mega-Recharge-Project-TBMRP.png?w=1280&amp;ssl=1 1280w\" sizes=\"auto, (max-width: 614px) 100vw, 614px\" \/><\/p>\n<h2><strong>About Tapti Basin Mega Recharge Project (TBMRP)<\/strong><\/h2>\n<ul>\n<li><strong>TBMRP<\/strong> is a <strong>joint initiative<\/strong> between the Governments of <strong>Madhya Pradesh and Maharashtra\u00a0<\/strong><strong>to mitigate water scarcity.<\/strong><\/li>\n<li>It is positioned as the <strong>world\u2019s largest groundwater recharge project<\/strong>.<\/li>\n<li><strong>Project Objectives<\/strong>:\n<ul>\n<li>Ensure <strong>drinking water supply<\/strong> to <strong>northeastern Maharashtra<\/strong>, including <strong>Nagpur<\/strong>.<\/li>\n<li>Provide <strong>irrigation support<\/strong> to <strong>southern Madhya Pradesh<\/strong>, particularly <strong>Chhindwara district<\/strong>.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Water Allocation<\/strong>: <strong>Total planned water utilisation<\/strong>: <strong>31.13 TMC<\/strong> (Thousand Million Cubic Feet)<\/li>\n<li><strong>Irrigation Benefits<\/strong>:\n<ul>\n<li><strong>Madhya Pradesh<\/strong>: Irrigation coverage for <strong>1,23,082 hectares<\/strong><\/li>\n<li><strong>Maharashtra<\/strong>: Irrigation coverage for <strong>2,34,706 hectares<\/strong><\/li>\n<\/ul>\n<\/li>\n<li><strong>Proposed Water Structures<\/strong>: Under the Project, four key water infrastructure components have been proposed: <strong data-start=\"170\" data-end=\"220\">Low Diversion Weir at Kharia Gutighat Dam Site<\/strong><span data-start=\"170\" data-end=\"220\">, <\/span><strong data-start=\"420\" data-end=\"450\">Right Bank Canal \u2013 Phase I,Left Bank Canal \u2013 Phase I and Left Bank Canal \u2013 Phase II. <\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>News: In a major step towards ensuring regional water security, the governments of Madhya Pradesh and Maharashtra signed a Memorandum of Understanding (MoU) on Saturday to collaboratively implement the Tapti Basin Mega Recharge Project. Tapti Basin Mega Recharge Project (TBMRP). About Tapti Basin Mega Recharge Project (TBMRP) TBMRP is a joint initiative between the Governments&hellip; <a class=\"more-link\" href=\"https:\/\/forumias.com\/blog\/tapti-basin-mega-recharge-project-tbmrp\/\">Continue reading <span class=\"screen-reader-text\">Tapti Basin Mega Recharge Project (TBMRP)<\/span><\/a><\/p>\n","protected":false},"author":10366,"featured_media":336874,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"footnotes":""},"categories":[1566,3127,12039],"tags":[11872,10498],"class_list":["post-336310","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-factly-articles","category-economy","category-knolls","tag-9pm-daily-factly","tag-the-hindu","entry"],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/forumias.com\/blog\/wp-content\/uploads\/2025\/05\/Tapti-Basin-Mega-Recharge-Project-TBMRP.png?fit=1280%2C850&ssl=1","views":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/336310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/users\/10366"}],"replies":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/comments?post=336310"}],"version-history":[{"count":0,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/336310\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/media\/336874"}],"wp:attachment":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/media?parent=336310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/categories?post=336310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/tags?post=336310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}