{"id":86520,"date":"2020-04-23T02:45:14","date_gmt":"2020-04-22T21:15:14","guid":{"rendered":"http:\/\/factly.forumias.com\/?p=14971"},"modified":"2020-04-23T02:45:14","modified_gmt":"2020-04-22T21:15:14","slug":"renewable-energy-manufacturing-parks","status":"publish","type":"post","link":"https:\/\/forumias.com\/blog\/renewable-energy-manufacturing-parks\/","title":{"rendered":"Renewable Energy Manufacturing Parks"},"content":{"rendered":"\n<p><strong>News:<\/strong>The Ministry of Renewable Energy has asked all states and ports to identify lands that can be used to set up Renewable energy(RE) manufacturing Parks.<\/p>\n\n\n\n<p><strong>Facts:<\/strong><\/p>\n\n\n\n<p><strong>Aim:<\/strong>To meet the domestic demands as well as to attract firms shifting base from China amid COVID-19 pandemic which has disrupted supply chains.<\/p>\n\n\n\n<p><strong>Functions: <\/strong>These parks will:-<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>manufacture equipment like silicon ingots &amp; cells, wind equipment among others.<\/li><li>export equipment and services in the Renewable energy(RE) sector.<\/li><\/ul>\n\n\n\n<p><strong>Additional Facts:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>India has around 10 GW and 3 GW of wind and solar equipment manufacturing capacity respectively.<\/li><li>India met 92.11% of its solar equipment requirement through imports in 2017-18.<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>News:The Ministry of Renewable Energy has asked all states and ports to identify lands that can be used to set up Renewable energy(RE) manufacturing Parks. Facts: Aim:To meet the domestic demands as well as to attract firms shifting base from China amid COVID-19 pandemic which has disrupted supply chains. Functions: These parks will:- manufacture equipment&hellip; <a class=\"more-link\" href=\"https:\/\/forumias.com\/blog\/renewable-energy-manufacturing-parks\/\">Continue reading <span class=\"screen-reader-text\">Renewable Energy Manufacturing Parks<\/span><\/a><\/p>\n","protected":false},"author":61,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"footnotes":""},"categories":[3127],"tags":[4088],"class_list":["post-86520","post","type-post","status-publish","format-standard","hentry","category-economy","tag-renewable-energy-manufacturing-parks","entry"],"jetpack_featured_media_url":"","views":{"total":0,"cached_at":"","cached_date":1704710335},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/86520","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/comments?post=86520"}],"version-history":[{"count":0,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/86520\/revisions"}],"wp:attachment":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/media?parent=86520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/categories?post=86520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/tags?post=86520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}