{"id":88977,"date":"2019-04-22T16:30:21","date_gmt":"2019-04-22T11:00:21","guid":{"rendered":"http:\/\/factly.forumias.com\/?p=3974"},"modified":"2019-04-22T16:30:21","modified_gmt":"2019-04-22T11:00:21","slug":"205-railway-projects-report-cost-overrun-of-rs-2-21-lakh-cr","status":"publish","type":"post","link":"https:\/\/forumias.com\/blog\/205-railway-projects-report-cost-overrun-of-rs-2-21-lakh-cr\/","title":{"rendered":"205 railway projects report cost overrun of Rs 2.21 lakh cr"},"content":{"rendered":"\n<ol class=\"wp-block-list\"><li>According to the report of the Statistics and Programme Implementation Ministry (MOSPI),Indian Railways accounts for nearly three-fifths of the 344 central sector projects that are facing huge cost overrun due to delay in implementation.<\/li><li>Cost overrun means spending more money on a project than that was planned in the budget or the actual extra amount that is spent.<\/li><li>The Ministry of Statistics and Programme Implementation(MOSPI) monitors central sector projects involving an expenditure of \u20b9150 crore and above.<\/li><li>After the railways,the power sector reported the second highest incidence of overall cost overrun.Of the 95 projects monitored by the ministry in the power sector,40 projects reported cost overrun.<\/li><li>Further,the third largest cost escalation was recorded in the road transport and highways sector where out of the 605 monitored projects, as many as 49 reported cost overrun.<\/li><\/ol>\n","protected":false},"excerpt":{"rendered":"<p>According to the report of the Statistics and Programme Implementation Ministry (MOSPI),Indian Railways accounts for nearly three-fifths of the 344 central sector projects that are facing huge cost overrun due to delay in implementation. Cost overrun means spending more money on a project than that was planned in the budget or the actual extra amount&hellip; <a class=\"more-link\" href=\"https:\/\/forumias.com\/blog\/205-railway-projects-report-cost-overrun-of-rs-2-21-lakh-cr\/\">Continue reading <span class=\"screen-reader-text\">205 railway projects report cost overrun of Rs 2.21 lakh cr<\/span><\/a><\/p>\n","protected":false},"author":61,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"footnotes":""},"categories":[1760],"tags":[6325,3471,6326],"class_list":["post-88977","post","type-post","status-publish","format-standard","hentry","category-polity-and-nation","tag-cost-overrun","tag-mospi","tag-railway-projects","entry"],"jetpack_featured_media_url":"","views":{"total":0,"cached_at":"","cached_date":1703663052},"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/88977","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/comments?post=88977"}],"version-history":[{"count":0,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/posts\/88977\/revisions"}],"wp:attachment":[{"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/media?parent=88977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/categories?post=88977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/forumias.com\/blog\/wp-json\/wp\/v2\/tags?post=88977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}