Because of the corona virus issue? If it does not happen then worst affected will be people whose interview is stuck, around 600-700 such people I think are yet to appear for their interview.
@neyawn sir and others, what is your take?
This is the official Thread for discussion of Prelims Postponement, Please do not create new threads for the same.
it is either 3 or 123 for dams monsoon RC
but since author emphasizes only on creating space prior to monsoon.. will second option be wrong..hence 3 only
For statement 3
The world over, dams are constructed mainly for the purposes of irrigation, power generation, and flood control. While the first two roles are acknowledged, the role of dams in flood control has always been underestimated. It is unfortunate that in both irrigation and hydel projects, flood control is completely ignored.
For statement 2
However, it is unfortunate that the maximum amount of water is stored in reservoirs even before the close of the monsoon, only to ensure greater electricity generation and irrigation.
(Note risk is due to electricity generation and irrigation both...not hydropower alone)
hence most likely answer is 3 only here
Also the overall crux of article is “
There should be space for greater storage of water in reservoirs before the onset of monsoon
anyone who has mistake in mplad question send ur representation . download yearbook pdf from here
https://freeupscmaterials.org/india-year-book-2020-pdf/
send it to upsc . page number 110 . point number - h
send representation here
https://upsconline.nic.in/miscellaneous/QPRep/index.php
shayad last year kam cutoff ki wajha se sincere log conservatively attempt krke aaye. unka to patta kat gaya zyada tar. tukke baz and freshers ka mixed bag hoga- ya toh bilkul 110+ ya 90- depending on luck. shayad isliye cutoff neeche jaa rha h. but thats just my analysis, baaki upsc maalik h.
@rafael 10% audit by district authority is mentioned in Mplads implementation guideline book
Statement 1 is wrong . Not that statement . Yearbook says mp can give 20lakhs for various articles of handicap people like tricycle , artificial limb etc
In March 2017, the National Tiger Conservation Authority (NTCA) issued an order to deny forest rights in critical tiger habitats (core areas of tiger reserves) in the absence of CWH guidelines.
Sunderban core area 1330sq km2
Nagarjuna sresilam 1200 sq km2
In March 2017, the National Tiger Conservation Authority (NTCA) issued an order to deny forest rights in critical tiger habitats (core areas of tiger reserves) in the absence of CWH guidelines.
Sunderban core area 1330sq km2
Nagarjuna sresilam 1200 sq km2
brother, i get, even i did such useless research last year. i too was unable to face reality. this question is wrong for me also. there is zero controversy in it. please accept and move on. i know its hard.
@Equalizer any idea about why people are doubting block chain question?
What have u marked?
@Equalizer any idea about why people are doubting block chain question?
ppl are doubting even sunderbans and ghantasala so anything can happen here. only 4 questions remain doubtful as per me- 1.desher katha bengal 2.rukhmabai womens right to ed 3.preamble legal effect 4.minister eligible. no conclusive answer.