ForumIAS LATEST
- 31 May |Post Prelims Meet with Ayush Sir | Offline Session to discuss the Post-Prelims agenda | ForumIAS Click Here to register for the event →
- 02 June |Open Session - The PSIR Mark Improvement by Aman Aloon (AIR 295, UPSC CSE 2025)|Click Here to register for the event →
- 04 June | Open Orientation for GSAP 2026| Click Here to register →
- 06 June | Open Orientation on Essay Guidance Program (EGP 2026) Click Here to register →
- 07 June | Open Orientation for Current Affairs for Mains 2026 Click Here to register →
- The Indian Space Research Organization (ISRO) has announced that Chandrayaan-2, India’s second Moon mission, will be launched on July 15, 2019
- Chandrayaan-2 will comprise of an Orbiter, Lander named ‘Vikram’ and Rover named ‘Pragyan’ for the first time in an Indian space mission. The moon landing is planned for September 6 or 7.
- The orbiter will circle the moon and provide information about its surface, while the lander will make a soft landing on the surface and send out the rover. The rover will be used mostly for in situ experiments.
- Chandrayaan-2 will launch aboard a Geosynchronous Satellite Launch Vehicle Mark III, (GSLV -MK III) rocket. The GSLV-Mk III is a three-stage heavy lift launch vehicle that has been designed to carry four-tonne class satellites into Geosynchronous Transfer Orbit (GTO).
- In October 2008, ISRO had launched its orbiter mission Chandrayaan-1 on its PSLV booster. The spacecraft had 11 payloads. One of the U.S. payloads shares credit with Chandrayaan-1 for confirming the presence of water ice on the moon. Before that, the Moon Impacter Probe carrying the Indian tricolour image was made to hard-land on the lunar South Pole.




