ForumIAS LATEST
- 15 Sept. | Current Affairs Pre-cum-Mains 2027 Morning 11 AM batch starts from 15th Sept. Click Here to Read More →
- 14 Sept. | Forum Residential Coaching (FRC) for UPSC preparation Click Here to know more →
- 14 Sept. | GS Advance Program (GSAP) for UPSC 2027 Mains starts from 14th Sept. Click Here to Read More →
News: The Concession Agreement was signed between the Royal Government of Bhutan and Kholongchu Hydro Energy Limited for the Kholongchhu (Joint Venture) Hydroelectric Project.
Facts:
- Kholongchu Hydroelectric Project: It is a run-of-the-river project located on the lower course of the Kholongchu River in Trashiyangtse district in eastern Bhutan.
- Implementation: The project will be implemented by Kholongchhu Hydro Energy Limited, a joint venture company formed between Druk Green Power Corporation(DGPC) of Bhutan and Satluj Jal Vidyut Nigam Limited(SJVN) of India.



