NEWS
- 25 March | The Honest UPSC Talk Nobody Tells You Click Here to see Abhijit Asokan AIR 234 talk →
- 10 March | SFG Folks! This dude got Rank 7 in CSE 2025 with SFG! →
- 10 March | SFG Folks! She failed prelims 3 times. Then cleared the exam in one go! Watch Now! →
- The Indian Space Research Organization (ISRO) has announced that Chandrayaan-2, India’s second Moon mission, will be launched on July 15, 2019
- Chandrayaan-2 will comprise of an Orbiter, Lander named ‘Vikram’ and Rover named ‘Pragyan’ for the first time in an Indian space mission. The moon landing is planned for September 6 or 7.
- The orbiter will circle the moon and provide information about its surface, while the lander will make a soft landing on the surface and send out the rover. The rover will be used mostly for in situ experiments.
- Chandrayaan-2 will launch aboard a Geosynchronous Satellite Launch Vehicle Mark III, (GSLV -MK III) rocket. The GSLV-Mk III is a three-stage heavy lift launch vehicle that has been designed to carry four-tonne class satellites into Geosynchronous Transfer Orbit (GTO).
- In October 2008, ISRO had launched its orbiter mission Chandrayaan-1 on its PSLV booster. The spacecraft had 11 payloads. One of the U.S. payloads shares credit with Chandrayaan-1 for confirming the presence of water ice on the moon. Before that, the Moon Impacter Probe carrying the Indian tricolour image was made to hard-land on the lunar South Pole.




