November 21, 2024   Academy | Blog | Community | Our Philosophy
Subscribe to ForumIAS

Environment Impact Assessment (EIA)
Red Book
Red Book


EIA phenomenon and Associated initiatives

EIA is an issue concerning all countries. Due to the increasing awareness, govts. all around are taking steps to tackle EIA. In this section, we will provide you with updates related to EIA.

EIA updates/news
  • EAC Recommends the Great Nicobar Development Plan for EIA Study

    Synopsis: The Environment Appraisal Committee has recommended the  Great Nicobar Development plan for grant of terms of reference for EIA studies. The committee also flagged a few critical concerns.

    Introduction 

    The Environment Appraisal Committee (EAC) had raised serious concerns about NITI Aayog’s ambitious project for the Great Nicobar Development plan. However, the EAC has also recommended the plan for a term of reference (TOR) for Environmental Impact Assessment (EIA) studies. 

    About the NITI Aayog’s Great Nicobar Development plan:

    NITI Aayog developed a ‘Holistic Development of Great Nicobar Island at Andaman and Nicobar Islands’ plan. 

    The plan proposal includes construction of the following,

    • An international container trans-shipment terminal,
    • A greenfield international airport,
    • A power plant and a township complex spread over 166 sq. km
    • Andaman and Nicobar Islands Integrated Development Corporation (ANIIDCO) will be the nodal agency for the implementation of the Great Nicobar Development plan.

    A Gurugram-based consulting agency, Aecom India Private Limited, prepared the ‘pre-feasibility report of the Great Nicobar Development plan for NITI Aayog. The report mentioned the implementation of the plan will require an estimated cost of ₹ 75,000 crores.

    About the Environment Appraisal Committee:
    • A 15 member EAC headed by a marine biologist and former director, Bombay Natural History Society (BNHS), Deepak Apte was formed to study the pre-feasibility report.
    • Recently, the EAC made their decision and uploaded the documents on the MoEFCC’s Parivesh portal.
    • In that, it recommended the plan for Environmental Impact Assessment (EIA) studies.
    • Apart from that, the committee also raises few concerns with the plan.
    What were the concerns of the committee?

    The committee held two meetings one in March and the other in April. During that, it raises both technical and practical concerns. There was a delay in the discussion of the March meeting because of the incomplete submission of documents.

    1. The incomplete information includes the details of the township, information on seismic and tsunami risks, freshwater requirement details for projects and settlements, etc. Apart from that, the impact on the Giant Leatherback turtle was also incomplete.
      • After the completion of projects, the expectation are that nearly 6.5 lakh people will live on the island. The current population is only 8,500 on Great Nicobar. The current total population of the entire island chain is less than 4.5 lakh.
    2. The committee also pointed that there were no details of chopping off the trees. 130 sq. km. of the project area has some of the finest tropical forests in India. Hence, the numbers of chopped trees could run into millions.
    3. The committee asked for details of the corporate environment policy of the implementing agency. Similarly, the EAC also asks whether the company has an environmental policy, a prescribed standard operating procedure to deal with environmental and forest violations.
    4. AECOM’s pre-feasibility report has proposed 2022-23 for the start of work on the site. However, one year is not enough if the government and project proponents follow the EAC’s recommendations in letter and spirit. 
    5. Galathea Bay of Great Nicobar forms the centrepiece of the NITI Aayog proposal. The Plan aims to construct a port in Galathea Bay. But, this has a number of issues in the plan.
      • Firstly, ecological surveys have reported a number of new species, many restricted to just the Galathea region. These include the critically endangered Nicobar shrew, the Great Nicobar crake, the Nicobar frog etc. These are not mentioned in AECOM’s pre-feasibility report.
      • Secondly, the beaches at the mouth of the river Galathea in South Bay are among the most prominent nesting sites of Giant leatherback turtles.
      • Thirdly, the EAC highlighted that the site selection for the port had been done on technical and financial criteria. The environmental aspects were ignored.
      • Fourthly, so the EAC has asked for an independent evaluation for the aptness of the proposed port site with a specific focus on Leatherback Turtle.
    6. At present, the ANIIDCO is involved in activities such as tourism, trading and infrastructure development for tourism and fisheries. Its annual turnover for 2018-19 was ₹ 379 crore. But to manage the infrastructure project valued to cost ₹75,000 crore is way beyond its capacity.
    Action points suggested by the Environment Appraisal Committee:

    More than 100 specific points of action are listed out by the committee. The important ones include, 

    1. The need for an independent assessment of terrestrial and marine biodiversity
    2. A study on the impact of dredging, recovery and port operations, including oil spills.
    3. Analysis of risk-handling capabilities and a disaster management plan.
    4. Details of labour, labour camps and their requirements.
    5. The need for studies of alternative sites for the port with a focus on environmental and ecological impact
    6. Conducting a hydro-geological study to assess the impact on ground and surface water regimes. 

    Source: The Hindu

  • Centre seeks to replace EIA rules, activists rise in protest
    1. Central Government has released a draft rule which seeks to make changes in environmental approvals. The draft rules significantly dilute the process through which projects are granted environmental clearances.
    2. The existing Environment impact assessment(EIA) rules,2006 governs green clearance for all varieties of tasks such as mining, infrastructure, thermal, hydro, irrigation, and industries – across the country.
    3. The draft rules give local bodies such as municipalities, urban development authorities and district panchayats the authority to grant building permits for building or construction projects with a built-up area of more than 20,000 sq metres and less than 50,000 sq metres.
    4. The draft also offers clearance to diverse tasks such as twin carriageway tasks in border areas, growth of existing highways and growth of existing industrial tasks without an additional acquisition of land without environment appraisal.
    5. The draft rules also say that expansion of projects up to 50% of the existing capacity in various sectors will be exempted from any kind of public consultation. This covers the modernization of irrigation projects, roads and highways where no further acquisition of land is involved.
    6. However, environmental activists have protested against the draft. They said the draft should have addressed issues such as (a)miserable quality of EIA reports (b)compromised public hearings (c)rapid appraisal processes and (d)unhappy compliance monitoring.
    7. EIA is a process that studies all aspects of the environment and seeks to anticipate the impact (positive and/or negative) of a proposed project or development on the environment. EIA is mandatory under the Environmental (Protection) Act, 1986 for 29 categories of developmental activities involving investments of Rs. 50 crores and above.
  • Amendments to EIA NOTIFICATION, 2006

    News: Ministry of Environment, Forest and Climate Change, has made an amendment to EIA Notification 2006 to fasten availability/production of various drugs against COVID-19.

    Facts:

    • All projects or activities in respect of bulk drugs and intermediates, manufactured for addressing various ailments, have been re-categorized from the existing Category ‘A’ to ‘B2’ category.
    • Projects falling under Category B2 are exempted from the requirement of collection of Baseline data, EIA Studies, and public consultation.

    Additional Facts:

    Environment Impact Assessment (EIA)

    • EIA is a process that studies all aspects of the environment and seeks to anticipate the impact (positive and/or negative) of a proposed project or development on the environment.
    • EIA is mandatory under the Environmental (Protection) Act, 1986 for 29 categories of developmental activities involving investments of Rs. 50 crores and above.
    • Industrial Categorization:
      • Industrial Sectors having Pollution Index score of 60 and above – Red category
      • Industrial Sectors having Pollution Index score of 41 to 59 – Orange category
      • Industrial Sectors having Pollution Index score of 21 to 40 – Green category
      • Industrial Sectors having Pollution Index score incl.& upto 20 – White category

    Note: The Pollution Index PI is a number from 0 to 100. Higher value of PI denotes the high degree of pollution load from the industrial sector. The pharmaceutical industry lies in the Red category.


Discover more from Free UPSC IAS Preparation For Aspirants

Subscribe to get the latest posts sent to your email.

Blog
Academy
Community