ForumIAS LATEST
- FRC 2027: SFG Residential program | accepting application for Tranche-2 Click Here to know more →
- CSAT Classes for Prelims 2027 by Rishi Bhargav sir starts 16 Nov. at 5 PM Click Here to know more →
- Prelims Sprint classes 2027: Starts 2nd Nov. at 4:30 PM | First class open to all. Click Here to know more →
News: Gujarat government has awarded the contract for the construction of Bhadbhut barrage project.
Facts:
- Bhadbhut Project: It is a 1.7-km barrage project across the river Narmada and 25 km from the mouth of the river where it flows into the Gulf of Khambhat.
- Purpose:
- To prevent salinity ingress which refers to the process of saltwater invading areas which previously contained only freshwater.
- To stop most of the excess water flowing out of the Sardar Sarovar Dam from reaching the sea and thus create a sweet water lake on the river.
- To prevent flooding in years when rainfall is higher than normal by building embankments.
- The project is a part of Kalpasar Project which aims to build a 30 km dam across the Gulf of Khambhat for establishing a huge freshwater coastal reservoir for irrigation, drinking and industrial purposes.
Additional Facts:
- Barrage: It is an artificial barrier across a river or estuary to prevent flooding, aid irrigation or navigation or to generate electricity by tidal power.



