Pre-cum-Mains GS Foundation Program for UPSC 2026 | Starting from 5th Dec. 2024 Click Here for more information
News:India’s first Hybrid annuity model(HAM) in sewerage sector,a Sewage Treatment Plant (STP) was inaugurated in Sarai,Haridwar.
Facts:
About the Sarai Sewage Plant Project:
- The Plant is based on advanced aerobic biological process Sequential Batch Reactor(SBR) process.
- The project has been built under the Namami Gange project of National Mission for Clean Ganga(NMCG).
- The project is capable of removing the nutrients during treatment and is a 100% eco-friendly project.It will meet the highest standards of output parameters.
- The plant will be maintained and operated for a period of 15 years by the same developer for efficient performance and for meeting output parameters.
- It will bring substantial improvement in the quality of water of the river Ganga in Uttarakhand.
Additional information:
About Sequential Batch Reactor(SBR):
- Sequencing batch reactors(SBR) or sequential batch reactors are a type of activated sludge process for the treatment of wastewater.
- The reactor treat wastewater such as sewage or output from anaerobic digesters or mechanical biological treatment facilities in batches.
- Oxygen is bubbled through the mixture of wastewater and activated sludge to reduce the organic matter measured as biochemical oxygen demand (BOD) and chemical oxygen demand(COD).
- The treated effluent may be suitable for discharge to surface waters or possibly for use on land.
About National Mission for Clean Ganga (NMCG)
- It has been established as an Authority under National Council for River Ganga (Rejuvenation, Protection and Management) Act, 2016.
- It is the implementing agency of the Namami Gange Programme at the national level.
About Namami Gange programme:
- The Namami Gange was launched in 2015.It is an Integrated Conservation Mission which seeks effective abatement of pollution, conservation and rejuvenation of River Ganga.
- The main pillars of Namami Gange Programme are (a) Sewerage Treatment Infrastructure, (b) River-Surface Cleaning, (c) Afforestation, (d) Industrial Effluent Monitoring, (e) River-Front Development, (f) Biodiversity, (g) Ganga Gram and (h) Public Awareness.
About Hybrid Annuity model(HAM):
- Hybrid annuity model is a combination of Engineering, Procurement and Construction(EPC) and Build,Operate,Transfer(BOT) models.
- Under the EPC model,the government pays private players to lay roads.The private player has no role in the road’s ownership,toll collection or maintenance.
- Under the BOT model,private players have an active role.They build, operate and maintain the road for a specified number of years, before transferring the asset back to the government.The toll revenue collection arrangement is known as BOT-Annuity.
- Under the Hybrid annuity model,the government will provide 40% of the project cost to the developer to start work while the remaining 60% of the investment has to be made by the developer.
Advantages of Hybrid Annuity model:
- Private player has to arrange for only 60% of project cost.The exposure and risk reduces for the private player.
- Government will also benefits as it gets an opportunity to flag off projects by investing a portion of the project cost.
- All regulatory clearances risk, compensation risk and traffic risk is borne by government.Hence,private player will have minimal risk.
Discover more from Free UPSC IAS Preparation For Aspirants
Subscribe to get the latest posts sent to your email.