- FRC 2027: SFG Residential program | accepting application for Tranche-2 Click Here to know more →
- CSAT Classes for Prelims 2027 by Rishi Bhargav sir starts 16 Nov. at 5 PM Click Here to know more →
- Prelims Sprint classes 2027: Starts 2nd Nov. at 4:30 PM | First class open to all. Click Here to know more →
Source: The post is based on the article “ISRO successful in key test for India’s third moon mission” published in The Hindu on 28th February 2023
What is the News?
Indian Space Research Organisation(ISRO) has successfully conducted the flight acceptance hot test of the CE-20 cryogenic engine that will power the Cryogenic Upper Stage of the LVM3 launch vehicle for the Chandrayaan-3 mission.
CE-20 cryogenic engine will power the Cryogenic Upper Stage of the rocket called the LVM3 launch vehicle.
What is the Chandrayaan-3 Mission?
Chandrayaan-3 is India’s third moon mission and is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface.
The mission is slated to be launched later this year by Launch Vehicle Mark 3(LMV3) from the Satish Dhawan Space Centre at Sriharikota.
The mission has three major modules — propulsion, lander and rover modules.The mission’s complexity calls for establishing radio frequency(RF) communication links between the modules.



