- 04 June | MGP Strategy Series | GS Paper 4 (Ethics) with AIR 7 A.R. Rajah Mohaideen Click Here to register for the session →
- 04 June | GS Advance Program begins from 4th June 2026 | First 2 classes open to all Click Here to register for the event →
- 05 June | MGP Strategy Series | GS Paper 3 Strategy Session with AIR 406 Mannat Luthra Click Here to register for the session
- 06 June | Open Orientation on Essay Guidance Program (EGP 2026) Click Here to register →
- 07 June | Open Orientation for Current Affairs for Mains 2026 Click Here to register →
- 07 June | Sociology Optional Strategy Session with AIR 10 Ujjwal Priyank Click Here to register →
Source: The post is based on the article “ISRO successful in key test for India’s third moon mission” published in The Hindu on 28th February 2023
What is the News?
Indian Space Research Organisation(ISRO) has successfully conducted the flight acceptance hot test of the CE-20 cryogenic engine that will power the Cryogenic Upper Stage of the LVM3 launch vehicle for the Chandrayaan-3 mission.
CE-20 cryogenic engine will power the Cryogenic Upper Stage of the rocket called the LVM3 launch vehicle.
What is the Chandrayaan-3 Mission?
Chandrayaan-3 is India’s third moon mission and is a follow-on mission to Chandrayaan-2 to demonstrate end-to-end capability in safe landing and roving on the lunar surface.
The mission is slated to be launched later this year by Launch Vehicle Mark 3(LMV3) from the Satish Dhawan Space Centre at Sriharikota.
The mission has three major modules — propulsion, lander and rover modules.The mission’s complexity calls for establishing radio frequency(RF) communication links between the modules.



