ForumIAS LATEST
- 25 July | Winner's Mindset vs Loser's Mindset by Ayush Sinha | Click Here to Watch →
- 25 July | Inside My Daily UPSC Routine by AIR 175 Natasha Goyal | Click Here to Watch →
- 26 July | Prepare for Your Worst Day | Click Here to Watch →
- South Central Railway(SCR) has commissioned the longest electrified tunnel in Indian Railways in the state of Andhra Pradesh.
- The electrified tunnel is situated between Cherlopalli and Rapuru stations and is part of the railway line between Obulavaripalli– Venkatachalam – Krishnapatnam Port.
- It is constructed in the shape of ‘Horse Shoe’ on New Australian Tunnelling Method.
- The new line also facilitates direct and viable connectivity between South Coast and West Coast.
- It also opens up the viable rail connectivity between Krishnapatnam Port and its hinterland for freight train services.



