- 04 June | MGP Strategy Series | GS Paper 4 (Ethics) with AIR 7 A.R. Rajah Mohaideen Click Here to register for the session →
- 04 June | GS Advance Program begins from 4th June 2026 | First 2 classes open to all Click Here to register for the event →
- 05 June | MGP Strategy Series | GS Paper 3 Strategy Session with AIR 406 Mannat Luthra Click Here to register for the session
- 06 June | Open Orientation on Essay Guidance Program (EGP 2026) Click Here to register →
- 07 June | Open Orientation for Current Affairs for Mains 2026 Click Here to register →
- 07 June | Sociology Optional Strategy Session with AIR 10 Ujjwal Priyank Click Here to register →
Power Ministry feels no need to change electrification definition
What has happened?
The government had in September 2017 launched the Pradhan Mantri Sahaj Bijli Har Ghar Yojana (Saubhagya), aimed at covering the last-mile connectivity of taking electricity to the household level. The target for the scheme is March 31, 2019.
“Electrified village”
Village is declared electrified if at least 10% of its households have electricity connection
Official definition
A village is deemed to be electrified if basic infrastructure such as a distribution transformer and distribution lines are in place in the inhabited locality, electricity is provided to public places like schools, panchayat office, health centres, dispensaries, community centres, and at least 10% of the households in the village are electrified.
Saubhagya Scheme
- According to data from the Ministry of Power and the Central Electricity Authority, so far 84.3% of households have been electrified.
- The Saubhagya scheme defines the electrification of a household as including a service line cable, energy meter, and single point wiring
- For unelectrified households in remote areas, electrification will involve the provision of power packs of 200 to 300 W (with battery bank) with a maximum of 5 LED lights, 1 DC Fan, and 1 DC power plug
Ground reality different?
While several villages were deemed to be electrified in the official data, the on-ground engineers had registered complaints that key components such as transmission wires had been stolen, leaving the village unelectrified.