Q. Consider the following statements about the Green Energy Corridor Project for Intra-State Transmission System (InSTS):
1. It aims at synchronizing electricity produced from renewable sources.
2. The GEC-Intra State Transmission System (InSTS) project is sanctioned in 2020-21.
Which of the statements given above is/are not correct?
Answer: B
Notes:
About the Green Energy Corridor Project for Intra-State Transmission System (InSTS):
- The Green Energy Corridor (GEC) Project aims at synchronizing electricity produced from renewable sources such as solar and wind with conventional power stations in the grid.
- The GEC-Intra State Transmission System (InSTS) project was sanctioned in 2015-16, for evacuation and integration of the renewable energy capacity through setting up of transmission lines and increasing transformation capacity of substations.
Source: EPIC January 2022