Q. Consider the following statements regarding Ken-Betwa river linking project:
1.The project aims to transfer the surplus water from Betwa basin to Ken basin.
2.Both the Ken and Betwa rivers are tributaries of the Chambal river.
3.The Baghelkhand region is expected to benefit the most from the Project.
How many of the above statements are correct?
Answer: D
Notes:
Explanation: All Statements are incorrect
Statement 1 is incorrect: It is a river interlinking project designed to transfer surplus water from the Ken River (Madhya Pradesh) to the water-scarce Betwa basin (Uttar Pradesh).
Statement 2 is incorrect: The Ken and Betwa rivers are tributaries of the Yamuna river.
Statement 3 is incorrect: It is expected to bring prosperity to the drought-prone Bundelkhand region.
Source: HT
Discover more from Free UPSC IAS Preparation Syllabus and Materials For Aspirants
Subscribe to get the latest posts sent to your email.