Q. Which of the following is/are interim data of a budget?
1.Revised estimate
2.Quick estimate
3.Advance estimate
Choose the correct answer from below given codes:
Answer: D
Notes:
Explanation: Revised Estimate is basically a current estimation of either the budgetary estimates (BE) or the provisional estimates (PE). It shows the contemporary situation. It is an interim data.
- Quick Estimate (QE) Quick Estimate is a kind of revised estimate which shows the latest situation and is useful in the process of going for future projections for some sector or sub-sector. It is an interim data.
- Advance Estimate (AE) Advance Estimate is a kind of quick estimate but done ahead (is advance) of the final stage when data should have been collected. It is an interim data.
Source: Ramesh Singh