ForumIAS LATEST
- 27 June | Read Less, Revise More: IFoS AIR 36 Nikhil's UPSC Strategy | Click Here to Watch →
- 28 June | How to Score 300+ in Philosophy Optional by Yogita Singh Dhami | Click Here to Watch →
- 29 June | Public Administration OGP Advanced Open Class by Ajeet Sir | Click Here to Watch →
- 30 June I IFoS AIR 2 Anshuman Singh's Mock Interview | Click Here to Watch
- The Indian Space Research Organisation (ISRO) has said that Chandrayaan-2 is set to be launched any time between July 5 and July 16, 2019. The moon landing is likely to be in early September, 2019 close to the lunar South Pole.
- Chandrayaan-2 is India’s second mission to the moon. It is a totally indigenous mission. It comprises of an Orbiter, Lander named ‘Vikram’ and Rover named ‘Pragyan’
- The orbiter will circle the moon and provide information about its surface, while the lander will make a soft landing on the surface and send out the rover. The payloads will collect scientific information on lunar topography, mineralogy, elemental abundance, lunar exosphere and signatures of hydroxyl and water-ice.
- Chandrayaan-2 will launch aboard a Geosynchronous Satellite Launch Vehicle Mark III, (GSLV -MK III) rocket. The GSLV-MkIII is a three-stage heavy lift launch vehicle that has been designed to carry four-tonne class satellites into Geosynchronous Transfer Orbit (GTO).
- Chandrayaan-2 is a follow-up mission from the Chandrayaan-1 mission- India’s first lunar mission. It was launched in October 2008 and operated till August 2009. The mission included a lunar orbiter and an impactor. The mission was launched on board a PSLV.



