The 11,200 MW Siang Upper Multipurpose Project (SUMP) in Arunachal Pradesh has gained strategic importance following China’s decision to build the 60 GW Medog hydropower project on the Yarlung Tsangpo. India views SUMP as a means of strengthening water security and managing upstream risks. However, its proposed construction raises serious concerns over indigenous displacement, seismic vulnerability and downstream environmental damage.

Geopolitical and Strategic Dimensions of the Siang Dam

  1. China’s Upstream Hydropower Expansion: China formally began construction of its 60 GW Medog project in July 2025 at the Great Bend of the Yarlung Tsangpo. The project is expected to have five cascade power stations and generate approximately 300 billion units of electricity annually.
  2. Strategic Control over Transboundary Rivers: The Yarlung Tsangpo enters India as the Siang and later becomes the Brahmaputra. China’s upstream position raises concerns about sudden water releases, seasonal discharge variations, sediment movement and limited access to hydrological information.
  3. India’s Territorial and Strategic Concerns: China claims Arunachal Pradesh as part of South Tibet or Zangnan and issued standardised Chinese names for 27 locations in May 2025. India has firmly rejected these claims, making the Siang project important for its strategic interests in the eastern Himalayas.
  4. SUMP as a Strategic Water Buffer: The project proposes 9.2 billion cubic metres of live storage capacity to regulate sudden excess flows and maintain downstream water availability during reduced discharge. It is therefore envisaged as both a hydropower facility and a water-security measure.
  5. Strengthening India’s Riparian Position: India seeks to establish its legitimate interests in using and managing the Brahmaputra’s waters through domestic infrastructure. Developing storage and hydropower capacity would strengthen its ability to protect downstream interests against unilateral upstream interventions.
  6. India’s Dependence on Upstream Water: Arunachal Pradesh Chief Minister Pema Khandu has argued that around 65% of the Siang’s water originates in China. This strengthens India’s concerns about upstream interventions and the need for water-security preparedness.

Major Challenges Associated with the Siang Dam

  1. Displacement and Loss of Indigenous Livelihoods: The proposed reservoir could submerge 27 ancestral villages and displace an estimated 1.5 lakh people, according to concerns raised by affected communities. Compensation cannot fully address the loss of agricultural land, sacred sites, burial grounds and traditional social networks.
  2. Loss of Cultural Identity and Traditional Resources: The Siang, revered as Aane Siang (Mother Siang), holds deep spiritual and cultural significance for the Adi community. Its surrounding mountains and valleys provide water, food and medicinal plants while sustaining traditional practices and collective identity.
  3. Limitations of Tribal Land Protection: The Sixth Schedule provides Autonomous District Councils with powers over land, customary laws and local governance, but does not cover Arunachal Pradesh. The State relies partly on the Arunachal Pradesh Scheduled Tribes (Protection of Transfer of Land) Act, which restricts transfers to non-tribals but permits government acquisition for public purposes.
  4. Geological Risks of the Himalayan Region: The Siang Valley lies in a highly earthquake-prone region, raising concerns about large dam infrastructure. The 1950 Tibet-Assam earthquake of magnitude 8.6 triggered massive landslides and floods, demonstrating the region’s geological vulnerability.
  5. Structural Challenges of the Gravity Dam: The proposed 280–300-metre gravity dam would require extensive inundation to create its large reservoir. During an earthquake, ground movement or soil liquefaction beneath the structure could threaten its stability.
  6. Reservoir-Triggered Seismicity: Changes in water pressure from a large reservoir could reactivate existing geological faults beneath the Siang Valley. This phenomenon, known as Reservoir-Triggered Seismicity (RTS), creates additional earthquake-related concerns.

Environmental and Downstream Ecological Consequences

  1. Sediment Trapping and Downstream Erosion: The proposed gravity dam would trap sediments carried by the Siang River from the Himalayas. Sediment-deficient water, commonly called hungry water, could erode downstream riverbeds and banks while seeking to regain its sediment balance.
  2. Loss of Forests and Biodiversity: The Siang Valley lies within the Indo-Burma biodiversity hotspot, which supports thousands of endemic plant and animal species. The reservoir could submerge old-growth subtropical forests and damage habitats already facing pressure from nearby hydropower projects, including the 1,000 MW Naying project.
  3. Damage to Aquatic Ecosystems: A deep, stagnant reservoir could fragment the river’s aquatic ecosystem and affect migratory fish species. The Golden Mahseer, which depends on riverine habitats, is among the species potentially affected by these changes.
  4. Changes in Local Climatic Conditions: Creating a large artificial lake in a mountain gorge could alter local humidity, evaporation rates and mist patterns. These changes may disturb high-altitude farming and affect existing environmental conditions in the Siang Valley.
  5. Impact on Assam’s Agriculture and Majuli: Natural Brahmaputra floods deposit nutrient-rich silt that supports agricultural productivity in Assam’s plains. Sediment trapping could reduce this natural replenishment and threaten Majuli, the world’s largest river island, which already faces severe erosion.

Institutional and Diplomatic Gaps in Himalayan Water Governance

  1. Absence of a Bilateral Water-Sharing Treaty: India and China have no comprehensive, legally binding treaty governing the Brahmaputra’s water utilisation. Their cooperation has largely depended on limited Memorandums of Understanding (MoUs) for exchanging hydrological information during the flood season.
  2. Breakdown of Hydrological Data Sharing: The Brahmaputra data-sharing MoU between India and China expired on June 5, 2023, and information sharing was suspended. This interruption has weakened the regular exchange of upstream hydrological information needed for downstream flood forecasting and preparedness.
  3. Absence of a Common International Legal Framework: Neither India nor China is a party to the 1997 United Nations (UN) Watercourses Convention, which provides principles for equitable transboundary water use and preventing significant downstream harm. This limits the scope for a common treaty-based framework governing their shared river systems.
  4. Fragmented Regional Cooperation: Geopolitical mistrust, border disputes and unequal power relations prevent coordinated management of Himalayan rivers. The absence of a regional commission involving China, India, Nepal, Bhutan, Pakistan and Bangladesh weakens integrated management of the Brahmaputra and Indus river systems, particularly under climate change.

Way Forward

  1. Institutionalised Dialogue and Community Participation: The State government, Centre, NHPC and affected communities must establish regular dialogue. Traditional Adi institutions and organisations representing indigenous farmers must participate meaningfully in decisions affecting their land, livelihoods and cultural inheritance.
  2. Transparency in Project Assessment: The government must clearly distinguish between the ongoing pre-feasibility exercise and actual dam construction. Making the pre-feasibility report publicly accessible would address local concerns about the project’s future and improve transparency in decision-making.
  3. Independent Technical and Environmental Assessments: Independent experts must examine seismic vulnerability, reservoir safety, downstream ecological impacts and the extent of village submergence. Assessments must also cover rehabilitation requirements and the project’s cumulative impact on the Brahmaputra basin.
  4. Consideration of Alternatives and Responsible Development: The government must remain open to alternatives if independent assessments identify unacceptable social or environmental costs. Violence and vandalism must be rejected, while peaceful protests and genuine community concerns deserve consideration.
  5. Integrated National Security Approach: India must combine diplomatic firmness, credible water-security planning and border infrastructure with stronger frontier communities. Arunachal Pradesh’s people are important stakeholders in India’s sovereignty, and their confidence in the government strengthens national security.

Conclusion

The Siang project requires a careful balance between India’s strategic interests, indigenous rights and ecological sustainability. India’s response to China’s upstream interventions must not overlook frontier communities. Transparent decisions, scientific assessments and meaningful community participation are essential to protect water security without undermining local livelihoods and environmental stability.

Question for practice:

Evaluate the strategic importance of the Siang Upper Multipurpose Project and its implications for indigenous communities, environmental sustainability and India’s water security.

Source: The Hindu; Deccan Chronicle

Print Friendly and PDF