Kaleshwaram Lift Irrigation Project (KLIP)

sfg-2026
ForumIAS LATEST
      1. SFG FRC 2027 | Program starts from 19th Dec. 2026 | Admissions open for Entrance Test Click Here to know more →
      2. Prelims Test Series (PTS) for Prelims 2027 starts 11th Oct. 2026 Click Here to know more →
      3. [Pre-order] Ethics Redbook 3rd Edition: Delivery starts from 10th October onwards Click Here to Read More →
      4. 21 Sept. | GS Advance Program (GSAP) for UPSC 2027 Mains starts from 11th Oct. Click Here to Read More →

News- The National Dam Safety Authority (NDSA) reported substantial damage to the Kaleshwaram Lift Irrigation Project (KLIP) barrages following the 2023 flooding incident.

About Kaleshwaram Lift Irrigation Project (KLIP)

Kaleshwaram Lift Irrigation Project (KLIP) 
Source- Indian Express
  • It is a multi-purpose irrigation project located on the Godavari River in Kaleshwaram, Telangana.
    • The Godavari River, often referred to as the ‘Dakshin Ganga‘, is the largest river in Peninsular India. It originates from the slopes of the Western Ghats in Maharashtra’s Nasik district, it eventually drains into the Bay of Bengal.
  • KLIP is set to become the world’s largest multi-stage lift irrigation project.
    • In lift irrigation projects, water is not transported by gravity from higher to lower elevations through canals. Instead, it is pumped or raised using surge pools to a main delivery chamber located at the highest point of the project, from where it is then distributed to the beneficiary fields.
  • The project stretches approximately 500 km across 13 districts and includes a canal network spanning 1,800 km.
Print Friendly and PDF
Blog
Academy
Community