ForumIAS LATEST
- SFG FRC 2027 | Program starts from 19th Dec. 2026 | Admissions open for Entrance Test Click Here to know more →
- Prelims Test Series (PTS) for Prelims 2027 starts 11th Oct. 2026 Click Here to know more →
- [Pre-order] Ethics Redbook 3rd Edition: Delivery starts from 10th October onwards Click Here to Read More →
- 21 Sept. | GS Advance Program (GSAP) for UPSC 2027 Mains starts from 11th Oct. Click Here to Read More →
News:The most advanced Electronic Interlocking System has been installed on the Grand Chord route by the Indian Railways.
Facts:
About Electronic Interlocking system:
- This new Electronic system has replaced the outdated Mechanical Signalling System at Tundla Junction in UP on the route.
- The objective of installing the system is to help Indian Railways speed up trains and achieve the objective of reducing the travel time.
- The new system will reduce the time between Delhi and Howrah to about 12 hours from the existing 17 to 19 hours.
About Grand Chord route:
- Grand Chord is part of Howrah-Gaya-Delhi line and Howrah Allahabad Mumbai line.
- It acts as a link between Sitarampur in West Bengal and Pt. Deen Dayal Upadhyay Junction in Uttar Pradesh(UP).
- A lot of important trains pass through this route which connects national capital with eastern region of the country.



