ForumIAS LATEST
- 04 June | MGP Strategy Series | GS Paper 4 (Ethics) with AIR 7 A.R. Rajah Mohaideen Click Here to register for the session →
- 04 June | GS Advance Program begins from 4th June 2026 | First 2 classes open to all Click Here to register for the event →
- 05 June | MGP Strategy Series | GS Paper 3 Strategy Session with AIR 406 Mannat Luthra Click Here to register for the session
- 06 June | Open Orientation on Essay Guidance Program (EGP 2026) Click Here to register →
- 07 June | Open Orientation for Current Affairs for Mains 2026 Click Here to register →
- 07 June | Sociology Optional Strategy Session with AIR 10 Ujjwal Priyank Click Here to register →
‘Pattiseema scheme will help revive Krishna delta’
News:
- The Andhra Pradesh government has released water from Pattiseema Lift Irrigation into the Krishna Eastern Main Canal in Vijayawada.
Important Facts:
2. Issues
- Delay in releasing water to crops in Krishna Delta due to increasing number of reservoirs and barrages in Maharashtra and Karnataka
- As a result, crops are often destroyed due to cyclones hitting the state in November
3. Benefits of the Pattiseema Lift Irrigation Scheme:
- Facilitate revival of Krishna Delta which has dried up and turned saline in recent times
- Facilitate revival of Krishna River into a perennial river
- Address the problem of drought and drinking water shortage in the state.
- Future proposals:
- A barrage with a capacity of 10 tmcft, at Vaikuntapuram upstream the Prakasam Barrage.
- A barrage with a capacity of 2.7 tmcft, downstream at Chodavara



