Subansiri Lower Hydroelectric Project: How ignored landslide warnings led to Subansiri running dry
Red Book
Red Book

Pre-cum-Mains GS Foundation Program for UPSC 2026 | Starting from 5th Dec. 2024 Click Here for more information

Source: The post is based on the articleSubansiri Lower Hydroelectric Project: How ignored landslide warnings led to Subansiri running dry” published in “Indian Express” on 10th November 2023

Why in the News?

The Subansiri Lower Hydroelectric Project has experienced a setback due to a landslide that blocked the only operational diversion tunnel. This obstruction halted the flow of water downstream, impacting the Subansiri River.

What is the Subansiri Lower Hydroelectric Project?

Subansiri Lower Hydroelectric project
Source: MapsofWorld
SpecificationsDetails
What is itIt is an under construction gravity dam on the Subansiri River 

Note: A gravity dam is a dam constructed from concrete or stone-masonry. It is designed to hold back water by using only the weight of the material to resist the horizontal pressure of water pushing against it.

Located inArunachal Pradesh and Assam
Executed byNational Hydroelectric Power Corporation (NHPC)
SignificanceOnce completed, it will be the largest hydroelectric project in India

Where is the Subansiri River?

SpecificationsDetails
Tributary of Brahmaputra
Originates inTibet Plateau and enters India through Miri hills in Arunachal Pradesh.
Known asGold River
Passes through which Indian statesArunachal Pradesh and Assam
SignificanceIt is the largest tributary of Brahmaputra River.

UPSC Syllabus: Geography in News


Discover more from Free UPSC IAS Preparation For Aspirants

Subscribe to get the latest posts sent to your email.

Print Friendly and PDF
Blog
Academy
Community