Tapti Basin Mega Recharge Project (TBMRP)

sfg-2026
ForumIAS LATEST
    1. 31 Aug. | Upcoming programs by forumiAS For UPSC CSE 2027 Click Here to Read More →
    2. 23 August | Your preparation may need an environment, not another course Click Here to Read More →
    3. 17 August | Navigating the Crest & Trough of Rankforgers by Mr. Ayush Sinha Click Here to Watch →

News: In a major step towards ensuring regional water security, the governments of Madhya Pradesh and Maharashtra signed a Memorandum of Understanding (MoU) on Saturday to collaboratively implement the Tapti Basin Mega Recharge Project. Tapti Basin Mega Recharge Project (TBMRP).

Tapti Basin Mega Recharge Project (TBMRP)

About Tapti Basin Mega Recharge Project (TBMRP)

  • TBMRP is a joint initiative between the Governments of Madhya Pradesh and Maharashtra to mitigate water scarcity.
  • It is positioned as the world’s largest groundwater recharge project.
  • Project Objectives:
    • Ensure drinking water supply to northeastern Maharashtra, including Nagpur.
    • Provide irrigation support to southern Madhya Pradesh, particularly Chhindwara district.
  • Water Allocation: Total planned water utilisation: 31.13 TMC (Thousand Million Cubic Feet)
  • Irrigation Benefits:
    • Madhya Pradesh: Irrigation coverage for 1,23,082 hectares
    • Maharashtra: Irrigation coverage for 2,34,706 hectares
  • Proposed Water Structures: Under the Project, four key water infrastructure components have been proposed: Low Diversion Weir at Kharia Gutighat Dam Site, Right Bank Canal – Phase I,Left Bank Canal – Phase I and Left Bank Canal – Phase II.
Print Friendly and PDF
Blog
Academy
Community