Cabinet approves Luhri Stage-I Hydro Power Project

sfg-2026
ForumIAS LATEST
  1. 16 June | Failed Before Success: AIR 295 Reveals His UPSC Journey | Click Here to Watch →
  2. 17 June | How to Write High-Scoring Answers in Hindi Literature Optional | Click Here to Watch →
  3. 18 June | From Setback to Success: Bhavika Chopra's Rise to AIR 25 | Click Here to Watch →
  4. 19 June | The Rankforge Challenge (FRC/Tapasya): Truth About UPSC & Coaching by Ayush Sinha | Click Here to Watch →
  5. 20 June | 150+ Cleared UPSC Prelims from Naugaon, Alwar | The FRC Tapasya Success Story | Click Here to Watch →

News: Cabinet Committee on Economic Affairs(CCEA) has approved an investment of Rs 1,810 crore for the Luhri Stage-1 Hydro Electric Project.

Facts:

  • Luhri Stage-1 Hydro Electric Project: It is a 210 MW project being developed on the Satluj river in Shimla and Kullu districts of Himachal Pradesh.
  • Executed by: The project is being executed by the Satluj Jal Vidyut Nigam Ltd.

 

Additional Facts:

  • Sutlej River: It is the easternmost tributary of the Indus River.It is the longest of the five rivers that flow through the historic crossroads region of Punjab in northern India and Pakistan.
  • Dam: The Bhakra dam is built around the river Sutlej to provide irrigation and other facilities to the nearby areas.
  • Significance: The waters of the Sutlej are allocated to India under the Indus Waters Treaty between India and Pakistan and are mostly diverted to irrigation canals in India.

Tapovan Vishnugad Hydropower Project

Print Friendly and PDF
Blog
Academy
Community