ForumIAS LATEST
- Prelims Test Series (PTS) for Prelims 2027 starts 11th Oct. 2026 Click Here to know more →
- [Pre-order] Ethics Redbook 3rd Edition: Delivery starts from 10th October onwards Click Here to Read More →
- 21 Sept. | Forum Residential Coaching (FRC) for UPSC preparation Click Here to know more →
- 21 Sept. | GS Advance Program (GSAP) for UPSC 2027 Mains starts from 10th Oct. Click Here to Read More →
News: The Koldam NTPC Hydroelectric Project generated over 3512 million units of power in 2025-26, the highest ever since the project was commissioned.
About Koldam Hydro Power Project

- The Koldam Hydro Power Project is an 800 MW hydroelectric station located in the Bilaspur and Mandi districts of Himachal Pradesh, India.
- River associated: It is built on the Satluj River.
- Owned by: It is developed and owned by NTPC Limited.
- Dam Type: It is a 163-meter-high rock and gravel fill dam with a clay core.
- Beneficiary Regions: Supplies power to northern states including Himachal Pradesh, Punjab, Haryana, Rajasthan, Delhi, and Uttar Pradesh.



