Salal Hydroelectric Project

sfg-2026
ForumIAS LATEST
      1. FRC 2027: SFG Residential program | accepting application for Tranche-2 Click Here to know more →
      2. CSAT Classes for Prelims 2027 by Rishi Bhargav sir starts 16 Nov. at 5 PM Click Here to know more →
      3. Prelims Sprint classes 2027: Starts 2nd Nov. at 4:30 PM | First class open to all. Click Here to know more →

News: Authorities opened all gates of the Salal Dam after heavy rainfall sharply increased water inflow into the Chenab River and reservoir.

About Salal Hydroelectric Project

Salal Hydroelectric Project
Source – IE
  • Location: The Salal Hydroelectric Project is located in the Reasi district of Jammu and Kashmir.
  • Timeline: The project planning started in the 1960s, construction began in 1970, and commercial operation started in 1987.
  • River System: The project is built on the Chenab River  and harnesses its hydropower potential.
  • Developed and Owned by: The project is developed and owned by the National Hydroelectric Power Corporation (NHPC).
  • Type: The project is a 690 MW run-of-the-river hydropower project with Stage-I and Stage-II, each having three units of 115 MW.
  • Size: The Salal Dam is 130 m high and has an elevation of 1,627 feet above mean sea level. 
  • Strategic Importance: This was the first hydropower project built by India in Kashmir under the Indus Water Treaty regime.
  • Beneficiaries: The Jammu and Kashmir receives 12.5% of the energy generated from the project, while the remaining power is transmitted to the Northern Grid for distribution to Punjab, Haryana, Delhi, Himachal Pradesh, Rajasthan, and Uttar Pradesh.
Print Friendly and PDF
Blog
Academy
Community