- SFG FRC 2027 | Program starts from 18th Dec. 2026 | Admissions open for Entrance Test Click Here to know more →
- Prelims Test Series (PTS) for Prelims 2027 starts 11th Oct. 2026 Click Here to know more →
- [Pre-order] Ethics Redbook 3rd Edition: Delivery starts from 10th October onwards Click Here to Read More →
- 21 Sept. | GS Advance Program (GSAP) for UPSC 2027 Mains starts from 11th Oct. Click Here to Read More →
Source: The post is based on the article “Why trade unions in Kerala are opposing Centre’s power sector revamp scheme” published in Indian Express on 27th July 2023
What is the News?
The Kerala government is facing trouble over the Centre’s Revamped Distribution Sector Scheme (RDSS).
What is Revamped Distribution Sector Scheme(RDSS)?
Government of India has launched the Revamped Distribution Sector Scheme (RDSS) for the duration of 5 years i.e. from (FY 2021-22 to FY 2025-26).
Aim: To reduce the Aggregate Technical & Commercial (AT&C) losses to pan-India levels of 12-15% and Average Cost of Supply (ACS)-Average Revenue Realized(ARR) gap to zero by 2024-25.
Components: The Scheme has two major components: Part ‘A’ – Financial support for Prepaid Smart Metering & System Metering and upgradation of the Distribution Infrastructure and Part ‘B’ – Training & Capacity Building and other Enabling & Supporting Activities.
– Financial assistance to DISCOMs is provided for upgradation of the Distribution Infrastructure and for Prepaid Smart Consumer Metering & System Metering based on meeting pre-qualifying criteria and achieving basic minimum benchmark in reforms.
– The smart meters are meant to facilitate the reduction of distribution losses and enable automatic measuring of energy consumption.
– The installation of the pre-paid meters is to be done through the TOTEX (total expenditure, including capital expenditure and operational expenditure) model with public-private participation.
Why are organizations in Kerala opposing the RDSS project?
Trade unions are opposing the TOTEX model, in which a private firm installs and maintains smart meters. The private agency will recover the cost incurred in installments. The unions fear that the smart meter system will thus pave the way for the privatization of power distribution in the state.
What is the alternative suggested by the trade unions opposing the project?
Trade Unions opposing the TOTEX model claim that the state should manufacture smart meters using the technology developed by the central government institution Centre for Development of Advanced Computing (C-DAC) which is willing to share the know-how. This will help bring down the cost of the smart meters significantly.